The competence of program51 is based on the expertise of its founders. Here is a selection of references from projects executed by program51 or individually:
Year | Client | Project · Activity |
2020 – 2021 | International data center operator | Review of the planning and project organization for the power supply lines for a planned data center |
since 2019 | TenneT, Bayreuth, TransnetBW, Stuttgart | SuedLink, Planning and construction of a 750 km HVDC link in Germany. Supporting tender procedures, coordination of regional planning contracts, definition and implementation of a work package based execution model. |
since 2020 | Deutsche Giganetz, Hamburg | Construction and operation of FTTH networks in Germany. Supporting the start-up phase and projects. |
2020 | Markgraf, Bayreuth | SuedLink (southern area), framework contract for civil engineering. Proposal preparation and coordination. |
2019 | Thyssengas, Dortmund | Review of organisation of a project for subsequent acquisition of rights to land. |
2019 | Gasunie, Hannover | Consultant for management of major projects (natural gas pipelines). |
2016 – 2019 | TenneT, Bayreuth, TransnetBW, Stuttgart | SuedLink, federal planning procedure (Bundesfachplanung). Project management for an engineering JV. Preparation and coordination of tender documents and proceedings for “Zentraler Dienstleister” (EPCm-like execution model). |
2016 – 2018 | TenneT, Bayreuth | SuedLink, federal planning procedure (Bundesfachplanung). Overall project lead for client. |
2017 | Unitymedia, Kerpen | White spot fibre optic network expansion. Project management for planning, construction and commissioning of FttH projects in Germany. |
2015 – 2017 | Inter State Gas Systems (PVT.) Limited · für ILF | Gwadar – Nawabshah Gas Pipeline, 700km, 42". Project management, EPC tendering and contract award, consultant for permits and financing. |
2014 – 2016 | ILF – Beratende Ingenieure, München | Head of department “PM” with project controls, construction supervision, HSSEQ, risk management, technical safety, supply chain management, PMC. |
2013 – 2015 | TenneT, Bayreuth | SuedLink, federal planning procedure (Bundesfachplanung) for a 750 km overhead line. Overall project lead for client. |
2013 – 2014 | South Stream Bulgarien, für ILF | Gas pipeline South Stream in Bulgaria and Serbia, 1,500 km, 56" PMC services. |
2012 – 2013 | TenneT, Bayreuth | AC cable grid connection to offshore windfarm “Deutsche Bucht”. Coordinating the tender procedure of an EPC cable contract as project lead. |
2012 – 2013 | Nabucco International, Wien, für ILF mit Saipem | Gas pipeline Nabucco West, 1,300 km, 48" four countries. FEED, permits, rights of way, project management. |
2011 – 2013 | MCJV für APLNG für ILF, Brisbane, Australien | Gas pipeline 800 km, 42". Conflict management between engineer and EPC-contractor in detail design phase. |
2010 – 2013 | TenneT, Bayreuth | BorWin3, Planning and tendering of EPC contracts of a 160 km HVDC grid connection at the German North Sea. Overall project lead. |
2012 | Deutsche Bahn, Stuttgart | Main station Stuttgart 21 and high speed railway Wendlingen – Ulm. Consultant for frame contracts with authorities and re-location of fibre optic cables. |